Gauge Change Calculator (B Extruder RPM)

Line 31: 6–11 µm. Line 33: any gauge up to 120 µm (typed entry). Line 33 split: A=8%, B=84%, C=8%.

A 8% • B 84% • C 8%
Extruder % of B (Current Job)
Extruder % of B (Next Job)
B is assumed 100%. “Factor” proxy: F = 1 + A% + C% + D% + E% (all ÷ 100). Line 33 forces A/C=8 and D/E=0.
Base: RPM_new = RPM_cur × (Gauge_new/Gauge_cur). Options apply multipliers for speed and % changes.
Gauge Ratio (New / Current)
unitless
Speed Ratio (New / Current)
unitless
Extruder Factor (Cur → New)
F_cur / F_new applied if enabled
New B RPM
RPM
RPM Change
RPM
RPM % of Current
%
Implied A RPM (Line 33)
RPM (A% of B)
Implied C RPM (Line 33)
RPM (C% of B)
Enter current job and next job, then calculate.